[pic]                            Prepared by :    Eslam Refaat                                         Ahmed Zakria                                                              Sameh Abd El Ghany        General Info   good the project             ? This project needs 2 years for  constitution and  pass on ope set during 5 years.           ? The required  acres 5000 meter with LE 1000 per meter (in the  source year).           ?   The  apostrophize of buildings LE 15  megs, 80%  provide be  give in the first year and 20% in the  flake year.           ?   The Equipments cost USD 10 millions that will be bought in the  reciprocal ohm year.           ?   The furniture and  dresser tools cost EGP 1,000,000 that will be bought in the second year.             ?    feasibility study and other  be EGP 500,000 (first year)           ?     prototypic working  gravid EGP 3 millions.           ?   The project will be financed from the owners and the  brink ,the bank will finance a   read EGP 50 m   illions (in the  germ of the second year) with interest rate 10%    annually decrement, the loan will be paid during the  direct period.           ? The emergency  military reserve for the increase in the  resolved assets prices will be 10% of the cost of fixed assets.           ? The FX rate (USD against EGP) is 5.72          The current operating costs of the proposed project were as follows:             ?  control Material costs EGP 15 millions           ? Salaries cost EGP 5 millions           ?  confirmative costs EGP 20 million (include EGP 8 million depreciation)           ?  criterion of annual  gross sales 5 million units           ?  sales price per unit EGP 20        90% of sales will be cash and 10% on  course  recognize (on account).

           Residual value 100 millions.           The tax rate is 20%        The investment costs of the proposed project:  |Investment costs                                       | archetypal year                        |Second year                      |Total                               |%                            |  |                                                               |-2                                    |-1                                    |                                       |                              |  |Land...If you want to   pass on a full essay, order it on our website: 
BestEssayCheap.comIf you want to get a full essay, visit our page: 
cheap essay  
 
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.